Welcome to our guide of all the standard classifications we use for our Construction Management product.
Tables / Trackers
Not started
No drilling or piling has occurred yet.
Drilling
Drilling underway, foundation preparation visible.
Piling
Some main beams may be mounted onto piles, but since the main beam is not complete, the classification remains piling.
Main Beams
Main beams installed across piles, structure forming.
Table Structure Complete
Some modules may be mounted, but since not all are mounted and racking is visible, the classification is ‘Table Structure Complete’.
Modules Mounted
All modules mounted and installation complete.
Cables
Not Started
No evidence of work having started on cables.
Breaking Ground
Evidence of the trench starting to be dug but not fully opened yet.
Trench Open
The trench has been dugged to contain the cables but there are no indication of cables having been installed.
Cable Installed
Cables are clearly installed at the bottom of the trench.
Trench Closed
The cables have been installed and the trench filled in. This will happen later in the project.
Not Started
Breaking Ground
Foundations Laid
Equipment Mounted
Inverters / Combiner Boxes
Not Started
Breaking Ground
Foundations Laid
Equipment Mounted
Complete
Fences
Not Started
Posts Placed
Fences Complete
Roads
Not Started
Breaking Ground
Roads Complete
Buildings
Not Started
Breaking Ground
Foundations Laid
Complete