Construction Management classifications & examples

Construction Management classifications & examples

Welcome to our guide of all the standard classifications we use for our Construction Management product.

Tables / Trackers

Not started

No drilling or piling has occurred yet.

      

Drilling

Drilling underway, foundation preparation visible.

      

Piling

Some main beams may be mounted onto piles, but since the main beam is not complete, the classification remains piling.

      

Main Beams

Main beams installed across piles, structure forming.

      

Table Structure Complete

Some modules may be mounted, but since not all are mounted and racking is visible, the classification is ‘Table Structure Complete’.

      

Modules Mounted

All modules mounted and installation complete.

      

Cables

Not Started

No evidence of work having started on cables.


Breaking Ground

Evidence of the trench starting to be dug but not fully opened yet.


Trench Open

The trench has been dugged to contain the cables but there are no indication of cables having been installed.


Cable Installed

Cables are clearly installed at the bottom of the trench.


Trench Closed

The cables have been installed and the trench filled in. This will happen later in the project.


Transformers

Not Started


      

Breaking Ground


Foundations Laid


Equipment Mounted


Transformers Complete



Inverters / Combiner Boxes

Not Started


      
      

Breaking Ground


      

Foundations Laid


      

Equipment Mounted


      

Complete


      

Fences

Not Started


Posts Placed


Fences Complete



Roads

Not Started


Breaking Ground


Roads Complete



Buildings

Not Started


Breaking Ground


Foundations Laid


Complete


    • Related Articles

    • Introduction to Construction Management

      Introduction Drone-based construction management is a very effective solution that provides your team with bird’s eyes insights giving the following benefits: Manage onsite construction tasks more efficiently Improve transparency and ease of ...
    • Construction Management - FAQs

      General Questions What are the key features of the Construction Management area of SolarGain? The purpose of Construction Management is to give all stakeholders a clear, real-time view of solar plant construction progress. Can I create my own reports ...
    • Adding Annotations in Construction Management

      Annotations The annotation module contains the list of all the saved annotations taken through the whole process of construction. Annotations are listed in 7 different columns: Event Date It specifies the flight date of the construction monitoring ...
    • Managing Construction Documents

      General The last tab on the Development & Construction area is Documents. This displays folders for Topographical files and Construction files. All files can be downloaded onto your device's hard drive by clicking the download button in the upper ...
    • Using the Construction Map View

      Map View The map section is composed of three different interaction areas: “Map layers”, “Action tools” an “Event date”. Map Layers The map layers, located at the left-hand side, can be turned on/off individually or per group. This way the user can ...